Triple

T3258270
Position Surface form Disambiguated ID Type / Status
Subject Chennai Metro E68347 entity
Predicate phaseIIStatus P8970 FINISHED
Object under construction LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: under construction | Statement: [Chennai Metro, phaseIIStatus, under construction]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: phaseIIStatus
Context triple: [Chennai Metro, phaseIIStatus, under construction]
  • A. phaseIIIDescription
    Indicates that the entity has a textual description specifically about its Phase III stage in a process, study, or project.
  • B. secondPhase chosen
    Indicates that an entity is in, or has progressed to, the second phase or stage of a multi-phase process or sequence.
  • C. phase2Enhancement
    Indicates that an entity is involved in or associated with the second phase of an enhancement or improvement process.
  • D. secondStage
    Indicates that something functions as the subsequent or follow-up stage in a multi-stage process or sequence.
  • E. secondStageType
    Indicates the specific kind or category of a process, object, or event that occurs as the second stage in a multi-stage sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad858f74408190bcbd07f967cd7bd0 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69adaf6a46448190a7fa0ca83fa096f8 completed March 8, 2026, 5:18 p.m.
PD Predicate disambiguation batch_69ada41ae74081909a0d1d696be8e35e completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:09 p.m.