Triple
T32572998
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chang’e 4 |
E832565
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Chinese space mission |
C53146
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Chinese space mission Context triple: [Chang’e 4, instanceOf, Chinese space mission]
-
A.
Chinese space program asset
chosen
A Chinese space program asset is any spacecraft, satellite, launch vehicle, ground facility, or related infrastructure owned, operated, or controlled by China to support its civil, military, or commercial space activities.
-
B.
Chinese national project
A Chinese national project is a large-scale, state-led initiative undertaken by the Chinese government to advance strategic economic, technological, social, or infrastructural goals at the national level.
-
C.
NASA space mission
A NASA space mission is a coordinated, goal-driven endeavor planned and executed by NASA to explore, observe, or utilize space using specialized spacecraft, instruments, and supporting ground operations.
-
D.
JAXA mission
A JAXA mission is a space exploration or research project planned, developed, and operated by the Japan Aerospace Exploration Agency to achieve specific scientific, technological, or exploratory objectives.
-
E.
space programme of a country
The space programme of a country is the organized set of governmental and/or national initiatives, institutions, and activities dedicated to developing and operating space technologies, missions, and policies for scientific, commercial, military, and strategic purposes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34927bb308190ad94da1b11cad13c |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 1:04 a.m.