Triple
T32564934
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Greater New Orleans Bridge |
E832335
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge over the Mississippi River |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge over the Mississippi River Context triple: [Greater New Orleans Bridge, instanceOf, bridge over the Mississippi River]
-
A.
river bridge
chosen
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
B.
Hudson River bridge
A Hudson River bridge is a large transportation structure spanning the Hudson River to connect communities and facilitate the movement of vehicles, trains, pedestrians, or utilities between its banks.
-
C.
교량
교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
-
D.
bridge in New York City
A bridge in New York City is a large-scale transportation structure spanning waterways or land to connect boroughs and neighborhoods, supporting vehicular, rail, bicycle, and pedestrian traffic within the city’s dense urban environment.
-
E.
разводной мост
Разводной мост — это мостовая конструкция с подвижными пролетами, которые могут подниматься или раздвигаться для пропуска судов по водному пути.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34927bb308190ad94da1b11cad13c |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 1:03 a.m.