Triple
T32555031
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Get Down |
E832073
|
entity |
| Predicate | originallyPlannedBudget |
—
|
GENERATED |
| Object | high-budget production |
—
|
UNRECOGNIZED GENERATED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: originallyPlannedBudget Context triple: [The Get Down, originallyPlannedBudget, high-budget production]
-
A.
reportedBudget
chosen
Indicates that a specific budget amount or plan has been formally stated or disclosed, typically by one party to another or to the public.
-
B.
originallyPlannedFor
Indicates that something was initially intended, designed, or scheduled to be used for or associated with a particular purpose, event, or entity, regardless of what ultimately occurred.
-
C.
budgetFrom
Indicates that a budget or funding allocation originates from or is provided by a particular source.
-
D.
originalPlan
Indicates that one entity is the initial or primary plan or intended course of action associated with another entity.
-
E.
plannedAgainst
Indicates that an entity has formulated or coordinated plans targeting another entity, typically with opposing or adversarial intent.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34926b9848190ace47d2dd0a0de7c |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 1:03 a.m.