Triple

T32533874
Position Surface form Disambiguated ID Type / Status
Subject Bhima Irrigation Project E831536 entity
Predicate instanceOf P0 FINISHED
Object multipurpose irrigation project C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multipurpose irrigation project
Context triple: [Bhima Irrigation Project, instanceOf, multipurpose irrigation project]
  • A. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • B. irrigation dam
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • C. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • D. irrigated district
    An irrigated district is a geographically defined area where water is systematically supplied and managed, typically through infrastructure like canals and pipelines, to support agricultural production and related land uses.
  • E. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34924b1cc8190ad3aca0c0f012a7e completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 1:01 a.m.