Triple

T32508189
Position Surface form Disambiguated ID Type / Status
Subject Chang’e 3 E830857 entity
Predicate instanceOf P0 FINISHED
Object Chinese lunar exploration mission C7208 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chinese lunar exploration mission
Context triple: [Chang’e 3, instanceOf, Chinese lunar exploration mission]
  • A. lunar exploration program
    A lunar exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study, visit, and potentially utilize the Moon’s environment and resources.
  • B. lunar sample-return mission
    A lunar sample-return mission is a spaceflight endeavor designed to land on the Moon, collect geological material, and transport it safely back to Earth for detailed scientific analysis.
  • C. NASA lunar impactor mission
    A NASA lunar impactor mission is a spaceflight project in which a spacecraft is deliberately crashed into the Moon’s surface to study its composition, structure, and environment through impact-generated data.
  • D. Chinese space program asset
    A Chinese space program asset is any spacecraft, satellite, launch vehicle, ground facility, or related infrastructure owned, operated, or controlled by China to support its civil, military, or commercial space activities.
  • E. lunar landing mission chosen
    A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3492318348190ba37fb6b5f1d67f4 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 1 a.m.