Triple
T32492286
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paparoa Track |
E830420
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-day track |
C3794
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-day track Context triple: [Paparoa Track, instanceOf, multi-day track]
-
A.
multi-day pass
A multi-day pass is a time-limited access credential that grants its holder unlimited or specified use of a service, venue, or system over a defined number of consecutive days.
-
B.
single track
A single track is a railway or transportation route consisting of only one set of rails or lane, requiring coordinated scheduling for traffic moving in both directions.
-
C.
track
A track is a defined path or course, often made of specific materials or markings, designed to guide or support the movement of objects, vehicles, or participants in activities such as transportation, racing, or recording.
-
D.
long-distance hiking trail
chosen
A long-distance hiking trail is an extended, often multi-day walking route designed for recreational trekking through diverse natural landscapes, typically marked and maintained for continuous foot travel.
-
E.
trail race
A trail race is a competitive running event held on natural off-road terrain such as dirt paths, forest tracks, and mountain trails, often featuring varied elevation and technical footing.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34920aa4081908d8fb0277414b911 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:59 a.m.