Triple
T32483812
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SkyBridge |
E830184
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transit bridge |
C47696
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transit bridge Context triple: [SkyBridge, instanceOf, transit bridge]
-
A.
public transport bridge
chosen
A public transport bridge is a dedicated crossing structure designed primarily for buses, trams, trains, or other mass transit vehicles to traverse obstacles such as rivers, roads, or valleys efficiently and safely.
-
B.
road and rail bridge
A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
-
C.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
D.
bridge operator
A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
-
E.
transporter bridge ferry
A transporter bridge ferry is a movable platform suspended from a high-level bridge structure that carries passengers and vehicles across a waterway by traversing along the bridge span.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3491ff3b48190b50a7fa00bb05b1f |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:58 a.m.