Triple
T3246904
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Outer Ring Road IT corridor |
E68086
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IT corridor |
C2218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IT corridor Context triple: [Outer Ring Road IT corridor, instanceOf, IT corridor]
-
A.
development corridor
chosen
A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
-
B.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
C.
population corridor
A population corridor is a geographic or infrastructural pathway that facilitates the movement, interaction, and distribution of people between distinct population centers.
-
D.
information and communications technology hub
An information and communications technology hub is a centralized environment—physical, virtual, or hybrid—where ICT infrastructure, services, expertise, and innovation converge to support connectivity, digital operations, and technological development for organizations and communities.
-
E.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad858e4c708190aa31d486cfee8a6a |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:09 p.m.