Triple

T32467986
Position Surface form Disambiguated ID Type / Status
Subject Quabbin Reservation E829765 entity
Predicate instanceOf P0 FINISHED
Object watershed protection area C32939 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: watershed protection area
Context triple: [Quabbin Reservation, instanceOf, watershed protection area]
  • A. watershed preserve chosen
    A watershed preserve is a protected natural area managed to safeguard the land, water, and ecological processes that collect, store, and filter water within a drainage basin.
  • B. watershed district
    A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
  • C. watershed
    A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
  • D. wetland conservation area
    A wetland conservation area is a designated natural region of marshes, swamps, bogs, or similar ecosystems protected to preserve biodiversity, maintain water quality, and support flood control and habitat functions.
  • E. watershed association
    A watershed association is a community-based organization dedicated to protecting, restoring, and sustainably managing the land, water, and ecological resources within a specific watershed.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3491ee87c81908cbf5890079c2af6 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:57 a.m.