Triple

T3246664
Position Surface form Disambiguated ID Type / Status
Subject Namma Metro E68080 entity
Predicate plannedExtension P11869 FINISHED
Object Yellow Line
The Yellow Line is a major corridor of Bengaluru’s Namma Metro system designed to improve north–south connectivity across the city.
E350731 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yellow Line | Statement: [Namma Metro, plannedExtension, Yellow Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Yellow Line
Context triple: [Namma Metro, plannedExtension, Yellow Line]
  • A. Yellow Line
    The Yellow Line is one of the color-coded rapid transit routes in the Washington Metro system, running primarily in a north–south direction and serving key areas in Washington, D.C. and Northern Virginia.
  • B. Yellow Line
    The Yellow Line is one of the primary passenger rail routes of the Tyne and Wear Metro rapid transit system serving the Newcastle upon Tyne area in North East England.
  • C. Yellow Line
    The Yellow Line is a designated route within the Baltimore Light Rail system that serves as one of its primary color-coded service lines.
  • D. Yellow Line
    The Yellow Line is a rapid transit route in Chicago's 'L' system that connects the northern suburb of Skokie to the city's rail network.
  • E. Yellow Line
    The Yellow Line is one of the main lines of the Lisbon Metro system, connecting key residential and commercial areas of Portugal’s capital.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Yellow Line
Triple: [Namma Metro, plannedExtension, Yellow Line]
Generated description
The Yellow Line is a major corridor of Bengaluru’s Namma Metro system designed to improve north–south connectivity across the city.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Yellow Line
Target entity description: The Yellow Line is a major corridor of Bengaluru’s Namma Metro system designed to improve north–south connectivity across the city.
  • A. Yellow Line
    Yellow Line is one of the major rapid transit corridors of the Delhi Metro network, connecting key areas across Delhi and its neighboring regions.
  • B. Yellow Line
    The Yellow Line is a designated route within the Baltimore Light Rail system that serves as one of its primary color-coded service lines.
  • C. Yellow Line
    The Yellow Line is one of the main lines of the Lisbon Metro system, connecting key residential and commercial areas of Portugal’s capital.
  • D. Yellow Line
    The Yellow Line is a rapid transit route in Chicago's 'L' system that connects the northern suburb of Skokie to the city's rail network.
  • E. Yellow Line
    The Yellow Line is one of the color-coded rapid transit routes in the Washington Metro system, running primarily in a north–south direction and serving key areas in Washington, D.C. and Northern Virginia.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad858e4c708190aa31d486cfee8a6a completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69adaf1c184c8190a43a3594decd0920 completed March 8, 2026, 5:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69b324f1baec8190b076b65fd7e4be2a completed March 12, 2026, 8:41 p.m.
NEDg Description generation batch_69b326620f048190b429ff62d037516c completed March 12, 2026, 8:47 p.m.
NED2 Entity disambiguation (via description) batch_69b326fadb388190981f38a083805ee5 completed March 12, 2026, 8:50 p.m.
Created at: March 8, 2026, 3:09 p.m.