Triple
T32446159
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Everett deep-water marine terminals |
E829152
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seaport facilities |
C53972
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seaport facilities Context triple: [Everett deep-water marine terminals, instanceOf, seaport facilities]
-
A.
seaport
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
B.
port facility complex
chosen
A port facility complex is an integrated area of land and water with infrastructure, equipment, and services designed to support the berthing, loading, unloading, storage, and transfer of cargo and passengers between sea and land transport modes.
-
C.
former port facility
A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
-
D.
maritime cargo terminal
A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
-
E.
inland port
An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3491d2e5c819092b1c9535beff8ec |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:56 a.m.