Triple

T32394494
Position Surface form Disambiguated ID Type / Status
Subject Snake River, Washington E827764 entity
Predicate usedFor P98 FINISHED
Object hydroelectric power generation LITERAL FINISHED

Named-entity recognition

Before disambiguation, gpt-5-mini classified whether the object phrase is a named entity — the step behind the object's LITERAL type shown above.

Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hydroelectric power generation | Statement: [Snake River, Washington, usedFor, hydroelectric power generation]

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69f349184e7481909c6c54428cb9cf12 elicitation completed
NER batch_69f6c212e5f08190acb45b9190a296fe ner completed
Created at: May 1, 2026, 12:52 a.m.