Triple

T32388121
Position Surface form Disambiguated ID Type / Status
Subject 赤門 E827592 entity
Predicate instanceOf P0 FINISHED
Object 江戸時代の建築物 C13444 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 江戸時代の建築物
Context triple: [赤門, instanceOf, 江戸時代の建築物]
  • A. Edo-period architecture chosen
    Edo-period architecture refers to the Japanese building styles from the early 17th to mid-19th centuries characterized by wooden construction, modular interiors, sliding doors, tatami flooring, and a balance of simplicity, functionality, and refined ornamentation seen in castles, temples, townhouses, and teahouses.
  • B. Meiji-era architecture
    Meiji-era architecture is a style from late 19th- to early 20th-century Japan that blends traditional Japanese design with Western architectural forms and technologies introduced during the country’s rapid modernization.
  • C. 歴史的建造物
    歴史的建造物は、過去の時代に建てられ、その時代の文化・技術・社会背景を今に伝える価値を持つ建築物である。
  • D. Edo period institution
    An Edo period institution is an organized social, political, economic, or cultural structure that operated in Japan between 1603 and 1868 under Tokugawa rule, shaping and regulating aspects of daily life and governance.
  • E. Joseon-era architecture
    Joseon-era architecture is a Korean architectural style characterized by wooden structures with gently curved tiled roofs, elevated stone platforms, and a balanced, minimalist layout that reflects Confucian ideals and harmony with nature.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349184e7481909c6c54428cb9cf12 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:51 a.m.