Triple

T32386939
Position Surface form Disambiguated ID Type / Status
Subject LM-5B E827567 entity
Predicate instanceOf P0 FINISHED
Object Long March 5 variant C3706 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Long March 5 variant
Context triple: [LM-5B, instanceOf, Long March 5 variant]
  • A. super heavy-lift launch vehicle
    A super heavy-lift launch vehicle is a powerful rocket system designed to carry extremely large payloads—such as crewed spacecraft, space station modules, or deep-space missions—into Earth orbit or beyond in a single launch.
  • B. heavy-lift launch vehicle chosen
    A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
  • C. Saturn V mobile launcher
    The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
  • D. orbital launch vehicle
    An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
  • E. Starship prototype
    A starship prototype is an experimental spacecraft design built to test advanced technologies, performance capabilities, and safety systems before full-scale production and deployment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349184e7481909c6c54428cb9cf12 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:51 a.m.