Triple

T32386223
Position Surface form Disambiguated ID Type / Status
Subject International Lunar Research Station E827551 entity
Predicate plannedOperationalPeriod P174268 FINISHED
Object long term LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: long term | Statement: [International Lunar Research Station, plannedOperationalPeriod, long term]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedOperationalPeriod
Context triple: [International Lunar Research Station, plannedOperationalPeriod, long term]
  • A. plannedOpeningPeriod chosen
    Indicates the time span during which something is scheduled or intended to open or begin operating.
  • B. implementationPeriod
    Indicates the time span during which a plan, project, or agreement is actively carried out or executed.
  • C. plannedEndYear
    Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
  • D. operatedDuring
    Indicates that an action, process, or system was functioning or in operation throughout a specified time period or event.
  • E. effectivePeriodStart
    Indicates the date and time when a specified condition, status, or agreement becomes valid or goes into effect.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349184e7481909c6c54428cb9cf12 completed April 30, 2026, 12:20 p.m.
NER Named-entity recognition batch_69f7b0e5744c8190a22c1e1d6fcfa466 completed May 3, 2026, 8:32 p.m.
PD Predicate disambiguation batch_69f7ab70d034819080295628497d8582 completed May 3, 2026, 8:09 p.m.
Created at: May 1, 2026, 12:51 a.m.