Triple
T32385112
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lingqu Canal |
E827526
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ancient canal |
C33499
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ancient canal Context triple: [Lingqu Canal, instanceOf, ancient canal]
-
A.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
B.
ancient causeway
An ancient causeway is a raised, often stone-paved roadway or path constructed across low or wet ground, marshes, or water to connect important settlements, ceremonial sites, or trade routes in antiquity.
-
C.
former canal
A former canal is a disused or decommissioned artificial waterway that once facilitated transportation, irrigation, or drainage but no longer serves its original function.
-
D.
historic irrigation canal
chosen
A historic irrigation canal is a man-made waterway constructed in the past to divert and distribute water for agricultural use, often reflecting the engineering practices and socio-economic conditions of its time.
-
E.
Renaissance aqueduct
A Renaissance aqueduct is a monumental water-conveyance structure that revives and refines classical Roman engineering principles to transport water over long distances using arches, channels, and gravity-driven flow.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349184e7481909c6c54428cb9cf12 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:51 a.m.