Triple

T32376750
Position Surface form Disambiguated ID Type / Status
Subject Lo Siento (Super Junior feat. Leslie Grace, production) E827307 entity
Predicate instanceOf P0 FINISHED
Object recording production C59814 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: recording production
Context triple: [Lo Siento (Super Junior feat. Leslie Grace, production), instanceOf, recording production]
  • A. record production project
    A record production project is a coordinated endeavor that plans, organizes, and manages all creative, technical, and logistical activities required to produce and deliver a finished recorded music release.
  • B. studio recording
    A studio recording is a professionally captured audio performance created in a controlled environment using specialized equipment to achieve high-quality sound.
  • C. recording band
    A recording band is a musical group that primarily focuses on creating, performing, and capturing music in studio or live recording environments for distribution and playback.
  • D. audio production chosen
    Audio production is the process of capturing, editing, mixing, and mastering sound to create polished audio content for music, film, podcasts, games, and other media.
  • E. screen production
    Screen production is the process of planning, creating, and assembling visual content for film, television, or digital platforms, encompassing pre-production, filming, and post-production activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349177ddc8190ab0583f05597056b completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:51 a.m.