Triple
T32376750
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lo Siento (Super Junior feat. Leslie Grace, production) |
E827307
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | recording production |
C59814
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: recording production Context triple: [Lo Siento (Super Junior feat. Leslie Grace, production), instanceOf, recording production]
-
A.
record production project
A record production project is a coordinated endeavor that plans, organizes, and manages all creative, technical, and logistical activities required to produce and deliver a finished recorded music release.
-
B.
studio recording
A studio recording is a professionally captured audio performance created in a controlled environment using specialized equipment to achieve high-quality sound.
-
C.
recording band
A recording band is a musical group that primarily focuses on creating, performing, and capturing music in studio or live recording environments for distribution and playback.
-
D.
audio production
chosen
Audio production is the process of capturing, editing, mixing, and mastering sound to create polished audio content for music, film, podcasts, games, and other media.
-
E.
screen production
Screen production is the process of planning, creating, and assembling visual content for film, television, or digital platforms, encompassing pre-production, filming, and post-production activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349177ddc8190ab0583f05597056b |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:51 a.m.