Triple

T32368931
Position Surface form Disambiguated ID Type / Status
Subject National Capital Region interprovincial transportation network E827077 entity
Predicate instanceOf P0 FINISHED
Object interprovincial transportation system C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interprovincial transportation system
Context triple: [National Capital Region interprovincial transportation network, instanceOf, interprovincial transportation system]
  • A. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • C. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • D. interstate highway system component
    An interstate highway system component is any physical or functional element—such as roadways, interchanges, signage, or support infrastructure—that collectively enables the operation, connectivity, and safety of the national interstate highway network.
  • E. state highway system
    A state highway system is a network of roads and highways maintained and regulated by a state government to facilitate regional transportation and connectivity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349166d548190887b412fe908e2f4 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:50 a.m.