Triple

T32352610
Position Surface form Disambiguated ID Type / Status
Subject Tamil Nadu Water Supply and Drainage Board E826645 entity
Predicate instanceOf P0 FINISHED
Object water supply authority C19730 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water supply authority
Context triple: [Tamil Nadu Water Supply and Drainage Board, instanceOf, water supply authority]
  • A. water management agency chosen
    A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
  • B. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • C. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • D. water management company
    A water management company is an organization that plans, operates, and maintains systems for sourcing, treating, distributing, conserving, and monitoring water resources for communities, industries, or agriculture.
  • E. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34915a2588190bb3178f5ec2f48f4 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:49 a.m.