Triple

T32352476
Position Surface form Disambiguated ID Type / Status
Subject Tamil Nadu Home Guards E826642 entity
Predicate instanceOf P0 FINISHED
Object civil defence auxiliary C31567 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: civil defence auxiliary
Context triple: [Tamil Nadu Home Guards, instanceOf, civil defence auxiliary]
  • A. civil defence equipment
    Civil defence equipment comprises tools, devices, and systems designed to protect civilians, support emergency response, and mitigate the impacts of disasters, conflicts, or other large-scale threats.
  • B. civilian auxiliary organization chosen
    A civilian auxiliary organization is a volunteer-based group of non-military citizens that supports and augments the capabilities, missions, or services of a governmental or official institution, often in areas like emergency response, public safety, or community outreach.
  • C. civil emergency service
    A civil emergency service is a public organization responsible for preparing for, responding to, and managing non-military crises and disasters to protect people, property, and the environment.
  • D. auxiliary military force
    An auxiliary military force is a supplementary, often non-regular or part-time armed organization that supports a nation’s primary military through additional manpower, specialized skills, or local defense roles.
  • E. auxiliary military personnel
    Auxiliary military personnel are non-regular service members who provide specialized or supporting functions—such as logistics, medical aid, intelligence, or technical services—to enhance and sustain the operations of a primary armed force.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34915a2588190bb3178f5ec2f48f4 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:49 a.m.