Triple

T32345660
Position Surface form Disambiguated ID Type / Status
Subject BNP Paribas Masters E826452 entity
Predicate instanceOf P0 FINISHED
Object ATP Tour tennis tournament C39721 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ATP Tour tennis tournament
Context triple: [BNP Paribas Masters, instanceOf, ATP Tour tennis tournament]
  • A. ATP Tour tournament level
    An ATP Tour tournament level represents a classification tier (such as Grand Slam, Masters 1000, ATP 500, or ATP 250) that defines the prestige, ranking points, and prize money associated with a men's professional tennis event.
  • B. ATP Tour Masters 1000 tournament chosen
    An ATP Tour Masters 1000 tournament is a top-tier professional men's tennis event, just below the Grand Slams in prestige, that awards 1000 ranking points to the singles champion and features the world's highest-ranked players competing across nine key tournaments each season.
  • C. men's professional tennis circuit
    The men's professional tennis circuit is the global, year-round series of sanctioned tournaments in which male tennis players compete for rankings, prize money, and titles under governing bodies such as the ATP and ITF.
  • D. tennis tournament circuit
    A tennis tournament circuit is an organized series of tennis competitions, often spanning multiple locations and dates, in which players accumulate results or points across events.
  • E. tennis tournament series
    A tennis tournament series is a structured sequence of related tennis competitions, often held over a defined period and linked by common rules, ranking points, sponsorship, or qualification pathways.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34914dfc48190a390cd0720d9e86f completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:48 a.m.