Triple
T32336644
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Winehaven Historic District |
E826191
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former winery complex |
C5037
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former winery complex Context triple: [Winehaven Historic District, instanceOf, former winery complex]
-
A.
wine cellar complex
A wine cellar complex is a specialized facility comprising interconnected storage, aging, and handling areas designed to preserve and manage wine collections under optimal environmental conditions.
-
B.
winery
chosen
A winery is a facility or business where wine is produced, often including vineyards for growing grapes, equipment for fermentation and aging, and spaces for tasting and sales.
-
C.
brewery complex
A brewery complex is a coordinated group of buildings and facilities where beer is produced, stored, packaged, and often served to the public, typically including brewing equipment, warehouses, administrative areas, and visitor spaces.
-
D.
former warehouse complex
A former warehouse complex is a large, previously industrial group of storage buildings now often repurposed for new commercial, residential, or cultural uses.
-
E.
vineyard
A vineyard is a cultivated area of land where grapevines are grown and managed primarily for the production of wine, table grapes, or raisins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34913d9048190befaa634025232be |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:48 a.m.