Triple
T32330809
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oceanarium |
E826044
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public aquarium facility |
C3847
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public aquarium facility Context triple: [Oceanarium, instanceOf, public aquarium facility]
-
A.
public aquarium
chosen
A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
-
B.
aquarium system
An aquarium system is an integrated setup of tanks, equipment, and controls designed to create and maintain a stable, healthy aquatic environment for fish, plants, and other organisms.
-
C.
aquarium chain
An aquarium chain is a business organization that operates multiple retail or public aquarium locations under a unified brand, offering aquatic animals, supplies, and related services across different geographic areas.
-
D.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
E.
aquaculture facility
An aquaculture facility is a controlled environment where aquatic organisms such as fish, shellfish, and plants are bred, reared, and harvested for commercial, research, or conservation purposes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34913d9048190befaa634025232be |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:47 a.m.