Triple

T32330809
Position Surface form Disambiguated ID Type / Status
Subject Oceanarium E826044 entity
Predicate instanceOf P0 FINISHED
Object public aquarium facility C3847 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public aquarium facility
Context triple: [Oceanarium, instanceOf, public aquarium facility]
  • A. public aquarium chosen
    A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
  • B. aquarium system
    An aquarium system is an integrated setup of tanks, equipment, and controls designed to create and maintain a stable, healthy aquatic environment for fish, plants, and other organisms.
  • C. aquarium chain
    An aquarium chain is a business organization that operates multiple retail or public aquarium locations under a unified brand, offering aquatic animals, supplies, and related services across different geographic areas.
  • D. oceanarium
    An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
  • E. aquaculture facility
    An aquaculture facility is a controlled environment where aquatic organisms such as fish, shellfish, and plants are bred, reared, and harvested for commercial, research, or conservation purposes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34913d9048190befaa634025232be completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:47 a.m.