Triple
T32318901
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EASy II |
E825716
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flight deck system |
C14046
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flight deck system Context triple: [EASy II, instanceOf, flight deck system]
-
A.
avionics system
chosen
An avionics system is an integrated collection of electronic hardware and software on an aircraft that manages navigation, communication, monitoring, and control functions to ensure safe and efficient flight operations.
-
B.
piggyback seaplane system
A piggyback seaplane system is an aircraft configuration in which a smaller, water-capable plane is mounted atop a larger carrier aircraft for transport, launch, or recovery operations over water.
-
C.
observation deck
An observation deck is an elevated platform, often atop a tall building or structure, designed to provide visitors with expansive views of the surrounding area.
-
D.
aircraft catapult system
An aircraft catapult system is a mechanical launch apparatus, typically using steam, electromagnetic, or hydraulic power, that rapidly accelerates aircraft to takeoff speed over a short distance, such as on an aircraft carrier deck.
-
E.
weapon system
A weapon system is an integrated set of components, technologies, and processes designed to detect, engage, and neutralize targets through the controlled application of force.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34912d0c48190bba75770660320e9 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:46 a.m.