Triple

T32307816
Position Surface form Disambiguated ID Type / Status
Subject IBR-2 reactor E825414 entity
Predicate instanceOf P0 FINISHED
Object pulsed research nuclear reactor C14333 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pulsed research nuclear reactor
Context triple: [IBR-2 reactor, instanceOf, pulsed research nuclear reactor]
  • A. pulsed neutron source chosen
    A pulsed neutron source is a facility or device that generates short, intense bursts of neutrons for applications such as materials research, nuclear physics experiments, and imaging.
  • B. plutonium production reactor
    A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
  • C. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • D. reactor safety research program
    A reactor safety research program is an organized, systematic effort to study, evaluate, and improve the safety, reliability, and risk management of nuclear reactors through experiments, modeling, and analysis.
  • E. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3491213b88190a57094d8697a7455 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:45 a.m.