Triple
T32306169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mingun Pahtodawgyi |
E825376
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | unfinished structure |
C41079
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: unfinished structure Context triple: [Mingun Pahtodawgyi, instanceOf, unfinished structure]
-
A.
unfinished building project
chosen
An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
-
B.
unfinished tower
An unfinished tower is a partially constructed vertical structure whose incomplete state reveals its intended height or form while remaining functionally or aesthetically unresolved.
-
C.
unfinished fort
An unfinished fort is a partially constructed defensive structure, typically consisting of incomplete walls, foundations, or earthworks, that was abandoned before reaching its intended military or protective capacity.
-
D.
unbuilt building
An unbuilt building is a fully conceived architectural design that exists only in plans, models, or visualizations and has not yet been constructed in physical form.
-
E.
unfinished painting
An unfinished painting is a work of visual art that remains incomplete, visibly lacking final details, sections, or refinement intended by the artist.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349115304819084ee91d345b6c8aa |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:45 a.m.