Triple

T32290502
Position Surface form Disambiguated ID Type / Status
Subject South Atlantic Central Water E824951 entity
Predicate ventilationProcess P173933 FINISHED
Object subduction along isopycnals from the surface LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: subduction along isopycnals from the surface | Statement: [South Atlantic Central Water, ventilationProcess, subduction along isopycnals from the surface]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: ventilationProcess
Context triple: [South Atlantic Central Water, ventilationProcess, subduction along isopycnals from the surface]
  • A. ventilationFeature
    Indicates that one entity has a structural or functional role related to providing, enabling, or affecting ventilation for another entity.
  • B. containmentVenting
    Indicates a relationship where a containment system releases or vents its contents, typically to relieve pressure or prevent overaccumulation.
  • C. controlsVentDistributionOn
    Indicates that one entity regulates or directs the distribution of airflow through vents on another entity.
  • D. hasVentilationShafts
    Indicates that one entity is equipped with or contains ventilation shafts that provide airflow or air passage.
  • E. hasVentilationBuildings
    Indicates that certain buildings are designated to provide ventilation for another structure, area, or system.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349101b788190b4f14884dc7d1ed2 completed April 30, 2026, 12:20 p.m.
NER Named-entity recognition batch_69f6bd334be48190a0b648eb8b9f1899 completed May 3, 2026, 3:12 a.m.
PD Predicate disambiguation batch_69f6b632cf788190a3d0c08cd026b84b completed May 3, 2026, 2:42 a.m.
PDg Predicate description generation batch_69f6b960ca4081909a77690c2b122f5e completed May 3, 2026, 2:56 a.m.
Created at: May 1, 2026, 12:44 a.m.