Triple

T3228933
Position Surface form Disambiguated ID Type / Status
Subject Adyar River E67689 entity
Predicate subjectOfProject P46299 FINISHED
Object Adyar River Restoration Project
The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
E338897 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Adyar River Restoration Project | Statement: [Adyar River, subjectOfProject, Adyar River Restoration Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Adyar River Restoration Project
Context triple: [Adyar River, subjectOfProject, Adyar River Restoration Project]
  • A. Muddy River Restoration Project
    The Muddy River Restoration Project is an environmental and flood-control initiative focused on rehabilitating the Muddy River’s ecosystem, improving water quality, and reducing storm-related flooding in its surrounding urban areas.
  • B. Don River and Central Waterfront Project
    The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
  • C. Kalpasar project
    The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
  • D. Projeto Água Limpa
    Projeto Água Limpa is an environmental and social initiative founded by Gisele Bündchen that focuses on protecting water resources and promoting sustainable development in Brazilian communities.
  • E. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Adyar River Restoration Project
Triple: [Adyar River, subjectOfProject, Adyar River Restoration Project]
Generated description
The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Adyar River Restoration Project
Target entity description: The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
  • A. Muddy River Restoration Project
    The Muddy River Restoration Project is an environmental and flood-control initiative focused on rehabilitating the Muddy River’s ecosystem, improving water quality, and reducing storm-related flooding in its surrounding urban areas.
  • B. Don River and Central Waterfront Project
    The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
  • C. Kalpasar project
    The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
  • D. Projeto Água Limpa
    Projeto Água Limpa is an environmental and social initiative founded by Gisele Bündchen that focuses on protecting water resources and promoting sustainable development in Brazilian communities.
  • E. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: subjectOfProject
Context triple: [Adyar River, subjectOfProject, Adyar River Restoration Project]
  • A. subjectOfWork
    Indicates that one entity is the main topic, focus, or theme that a particular work (such as a book, article, or artwork) is about.
  • B. typeOfProject
    Indicates the specific category or kind of project that an entity is associated with or classified under.
  • C. subjectOfCatalog
    Indicates that something is the primary focus or entry described within a catalog or cataloging record.
  • D. subjectMatter
    Indicates the topic, theme, or content area that something (such as a work, document, or discussion) is about.
  • E. project
    Indicates that an entity plans, organizes, or carries out a structured effort or initiative aimed at achieving a specific goal or outcome.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad858c61888190a31196310d9b30b5 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69adaeb6f8588190a33a9d6c779e8992 completed March 8, 2026, 5:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69b262675b588190bcff98e7fa3a0c77 completed March 12, 2026, 6:51 a.m.
NEDg Description generation batch_69b264c6022c81908b3235e88a7ed27f completed March 12, 2026, 7:01 a.m.
NED2 Entity disambiguation (via description) batch_69b268bd0d3c8190a60dda0a9086c0cc completed March 12, 2026, 7:18 a.m.
PD Predicate disambiguation batch_69ad9e0dc2248190a38c40f4e06cd41c completed March 8, 2026, 4:04 p.m.
PDg Predicate description generation batch_69ada0f9259c8190afbc5ad0fa55436b completed March 8, 2026, 4:16 p.m.
Created at: March 8, 2026, 3:08 p.m.