Triple
T32272780
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Camp Nido de Cóndores |
E824458
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | climbers’ camp |
C10873
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: climbers’ camp Context triple: [Camp Nido de Cóndores, instanceOf, climbers’ camp]
-
A.
mountaineering base camp
chosen
A mountaineering base camp is a temporary, strategically located encampment that serves as the primary logistical, acclimatization, and staging point for climbers attempting high-altitude ascents.
-
B.
alpine hut
An alpine hut is a simple, often remote mountain shelter that provides basic accommodation and protection for hikers, climbers, and mountaineers in high-altitude environments.
-
C.
alpine climbing area
An alpine climbing area is a high-altitude mountain environment offering established routes on rock, snow, and ice, typically requiring technical gear, route-finding skills, and awareness of rapidly changing weather and objective hazards.
-
D.
mountain refuge
A mountain refuge is a remote shelter or lodge in high-altitude or rugged terrain that provides basic protection, rest, and often simple services for hikers, climbers, and mountaineers.
-
E.
mountaineering duo
A mountaineering duo is a pair of climbers who work together to plan, ascend, and safely navigate mountain routes, sharing responsibilities, risks, and decision-making in alpine environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3490e73588190915f282edd105772 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:42 a.m.