Triple

T32270659
Position Surface form Disambiguated ID Type / Status
Subject ITDP Gold Standard BRT rating E824406 entity
Predicate instanceOf P0 FINISHED
Object public transport certification C5735 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transport certification
Context triple: [ITDP Gold Standard BRT rating, instanceOf, public transport certification]
  • A. transportation standard chosen
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • B. transportation executive
    A transportation executive is a senior leader responsible for planning, directing, and optimizing an organization’s transportation and logistics operations to ensure efficient, cost-effective, and compliant movement of goods or people.
  • C. transportation organization
    A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
  • D. Certificate of Suitability
    A Certificate of Suitability is an official document issued by a regulatory authority confirming that a substance, product, process, or facility meets predefined standards and requirements for its intended use.
  • E. transportation expert
    A transportation expert is a professional who analyzes, plans, and optimizes the movement of people and goods across various modes of transport to improve efficiency, safety, sustainability, and accessibility.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490e73588190915f282edd105772 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:42 a.m.