Triple

T32246135
Position Surface form Disambiguated ID Type / Status
Subject Captain America chopper E823752 entity
Predicate instanceOf P0 FINISHED
Object custom chopper C52665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: custom chopper
Context triple: [Captain America chopper, instanceOf, custom chopper]
  • A. prototype helicopter chosen
    A prototype helicopter is an experimental rotary-wing aircraft built to test and refine new aerodynamic designs, propulsion systems, or technologies before they enter full-scale production.
  • B. ducted fan tail rotor
    A ducted fan tail rotor is a shrouded, fan-like anti-torque and directional control device mounted at an aircraft’s tail, using a surrounding duct to improve efficiency, reduce noise, and enhance safety compared to an exposed tail rotor.
  • C. special wheeled chassis
    A special wheeled chassis is a customized mobile platform with wheels designed to support and transport specific equipment or payloads under particular performance, terrain, or operational constraints.
  • D. конструктор вертолётов
    Конструктор вертолётов — это специалист, который проектирует, рассчитывает и конструирует вертолёты и их системы, обеспечивая их безопасность, надёжность и соответствие техническим требованиям.
  • E. custom chip
    A custom chip is an integrated circuit specifically designed and fabricated to perform tailored functions or optimizations for a particular application or system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490cdda88190a9d61e11252a771f completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:40 a.m.