Triple
T32239266
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Akihabara Radio Kaikan |
E823562
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-story building |
C240
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-story building Context triple: [Akihabara Radio Kaikan, instanceOf, multi-story building]
-
A.
high‑rise building
A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
-
B.
office building complex
An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
-
C.
building
chosen
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
D.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
-
E.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3490c140481908ed53b98b561eaa1 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:39 a.m.