Triple

T32215174
Position Surface form Disambiguated ID Type / Status
Subject Isar E822907 entity
Predicate instanceOf P0 FINISHED
Object component of Isabelle C57887 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: component of Isabelle
Context triple: [Isar, instanceOf, component of Isabelle]
  • A. Isabelle front-end chosen
    Isabelle front-end is the user-facing interface layer of the Isabelle proof assistant that provides tools for editing, managing, and interacting with formal proofs and theories.
  • B. interactive theorem prover
    An interactive theorem prover is a software system that assists users in the formalization and step-by-step verification of mathematical proofs or program properties through human-guided logical reasoning.
  • C. component of structure
    A component of structure is an individual part or element that, when combined with other components, forms a larger, organized whole within a system or construction.
  • D. library ideal
    A library ideal is a conceptual standard for an optimally organized, accessible, and resource-rich library environment that maximizes learning, discovery, and user satisfaction.
  • E. Haskell infrastructure project
    A Haskell infrastructure project is a foundational software system, tooling, or service built in Haskell that supports, automates, or enhances the development, deployment, and operation of other Haskell applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490a3bec819097bc58d4731b9d08 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:37 a.m.