Triple
T32214988
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Isabelle/jEdit |
E822903
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Isabelle front-end |
C57887
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Isabelle front-end Context triple: [Isabelle/jEdit, instanceOf, Isabelle front-end]
-
A.
library ideal
A library ideal is a conceptual standard for an optimally organized, accessible, and resource-rich library environment that maximizes learning, discovery, and user satisfaction.
-
B.
front-end build tool
A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
-
C.
Elm
Elm is a deciduous tree known for its broad, serrated leaves, vase-shaped form, and use as a shade and ornamental species in temperate regions.
-
D.
front-end for R
A front-end for R is a user-facing interface or tool that allows users to write, run, and visualize R code and its outputs more easily, often abstracting away low-level details of the R environment.
-
E.
APT front-end
An APT front-end is a user-facing tool or interface that simplifies and manages interactions with the Advanced Package Tool (APT) system for installing, updating, and removing software packages.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3490a3bec819097bc58d4731b9d08 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:37 a.m.