Triple

T32212196
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle electrical power system E822837 entity
Predicate instanceOf P0 FINISHED
Object spacecraft electrical power system C15075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spacecraft electrical power system
Context triple: [Space Shuttle electrical power system, instanceOf, spacecraft electrical power system]
  • A. spacecraft power system chosen
    A spacecraft power system is the integrated set of components and subsystems that generate, store, condition, and distribute electrical energy to support all spacecraft functions throughout its mission.
  • B. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • C. spacecraft
    A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
  • D. spacecraft safety system
    A spacecraft safety system is an integrated set of hardware, software, and procedural controls designed to detect, prevent, and mitigate hazards to protect the vehicle, crew, payload, and mission throughout all phases of spaceflight.
  • E. astronaut propulsion system
    An astronaut propulsion system is a compact, controllable device that enables astronauts to maneuver independently in space by generating thrust through expelled propellant or alternative reaction-mass technologies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490a3bec819097bc58d4731b9d08 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:37 a.m.