Triple
T32184989
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Geronimo agreed to lay down arms |
E822083
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | militarySurrender |
C6718
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: militarySurrender Context triple: [Geronimo agreed to lay down arms, instanceOf, militarySurrender]
-
A.
military surrender
chosen
Military surrender is the formal act by which an armed force or nation yields control and ceases resistance to an opposing force, typically under agreed conditions.
-
B.
naval surrender
Naval surrender is the formal act by which a naval force ceases resistance and yields control of its ships, personnel, and strategic position to an opposing power, typically under agreed terms.
-
C.
surrender site
A surrender site is a designated location where one party formally yields control, authority, or possession to another, often in a legal, military, or contractual context.
-
D.
military withdrawal
Military withdrawal is the planned and coordinated removal of armed forces from an area of operations, often marking the end or repositioning of military engagement.
-
E.
surrender instrument
A surrender instrument is a formal legal document through which one party relinquishes control, rights, or claims—often in a military, property, or contractual context—to another party.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3490755288190aee11740a34862f9 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:35 a.m.