Triple

T32120351
Position Surface form Disambiguated ID Type / Status
Subject Shinall Mountain, Arkansas E820353 entity
Predicate instanceOf P0 FINISHED
Object broadcast transmission site C2861 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: broadcast transmission site
Context triple: [Shinall Mountain, Arkansas, instanceOf, broadcast transmission site]
  • A. broadcast station chosen
    A broadcast station is a facility equipped to transmit audio, video, or data content over radio, television, or digital channels to a dispersed audience.
  • B. broadcast transmission operator
    A broadcast transmission operator is responsible for setting up, monitoring, and adjusting the technical equipment that sends audio and video signals from a studio or control room to broadcast, cable, or streaming distribution systems.
  • C. broadcast television station
    A broadcast television station is a facility that produces, assembles, and transmits television programming over the airwaves to be received by the general public within a designated coverage area.
  • D. broadcasting headquarters
    A broadcasting headquarters is a central facility where television, radio, and digital media content is produced, managed, and transmitted to audiences across various distribution channels.
  • E. broadcast frequency
    Broadcast frequency is the specific radio frequency or range of frequencies assigned for transmitting audio, video, or data signals over the air to receivers within a coverage area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34902d42c819083a8e6bba9a8bb9a completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:28 a.m.