Triple

T32118611
Position Surface form Disambiguated ID Type / Status
Subject SNCO E820304 entity
Predicate instanceOf P0 FINISHED
Object enlisted rank tier C2796 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: enlisted rank tier
Context triple: [SNCO, instanceOf, enlisted rank tier]
  • A. army rank
    An army rank is a formal level of authority and responsibility within a military hierarchy that defines a soldier’s position, duties, and chain-of-command relationships.
  • B. military rank group chosen
    A military rank group is a classification that organizes individual military ranks into hierarchical categories based on authority, responsibility, and role within the armed forces structure.
  • C. military rank structure
    A military rank structure is a hierarchical system that organizes service members into levels of authority and responsibility, defining command relationships, roles, and progression within the armed forces.
  • D. senior enlisted rank
    A senior enlisted rank is a high-level non-commissioned position in the military hierarchy, typically responsible for expert technical skills, leadership, and advising officers on enlisted matters.
  • E. military-equivalent rank
    A military-equivalent rank is a formal position or title in a non-military organization that is defined to correspond in status, authority, or protocol to a specific rank within a military hierarchy.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490209c881908ec0241476715f15 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:28 a.m.