Triple
T32105104
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dniester Canyon sections |
E819959
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river canyon sections |
C40473
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river canyon sections Context triple: [Dniester Canyon sections, instanceOf, river canyon sections]
-
A.
canyon area
A canyon area is a deep, narrow valley with steep sides, often carved by a river, encompassing its rocky walls, floor, and surrounding terrain.
-
B.
rim of canyon
The rim of a canyon is the elevated edge or boundary where the relatively flat surrounding terrain abruptly transitions into the steep walls descending into the canyon below.
-
C.
canyon complex
A canyon complex is an interconnected system of deep, narrow valleys and gorges, often with branching side canyons and varied geological formations, created primarily by long-term erosion.
-
D.
waterway section
chosen
A waterway section is a defined segment of a natural or artificial watercourse, such as a river, canal, or channel, characterized by specific geographic, hydraulic, or administrative properties.
-
E.
canyoneering route
A canyoneering route is a planned path through a canyon that specifies the sequence of natural obstacles, required techniques, equipment, and difficulty level for safely descending or traversing it.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34901106881908ea893ad504a08be |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:27 a.m.