Triple

T32086121
Position Surface form Disambiguated ID Type / Status
Subject Toranomon Hills Business Tower E819449 entity
Predicate isUrbanRedevelopmentProject P57301 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [Toranomon Hills Business Tower, isUrbanRedevelopmentProject, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isUrbanRedevelopmentProject
Context triple: [Toranomon Hills Business Tower, isUrbanRedevelopmentProject, yes]
  • A. isPartOfUrbanProject
    Indicates that something belongs to, is included within, or constitutes a component of a broader urban development project.
  • B. redevelopmentProject chosen
    Indicates a project involving the renewal, improvement, or transformation of an existing area, structure, or infrastructure, typically replacing or upgrading what was previously there.
  • C. isRedevelopmentOf
    Indicates that one entity is a newer or modified version created by redeveloping, replacing, or substantially transforming another pre-existing entity.
  • D. urbanRedevelopmentArea
    Indicates that a location is designated for concentrated urban renewal activities such as redevelopment, revitalization, or land-use transformation.
  • E. urbanDevelopmentProject
    Indicates a project that plans, manages, or executes changes to urban areas, such as construction, renewal, or infrastructure improvements.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349004b2481908ce2e50af0d579a8 completed April 30, 2026, 12:20 p.m.
NER Named-entity recognition batch_69f6b58ab03c81908e023cdc4dcb7919 completed May 3, 2026, 2:40 a.m.
PD Predicate disambiguation batch_69f6b3a7bdb481908d16a32f49e38c2c completed May 3, 2026, 2:32 a.m.
Created at: May 1, 2026, 12:24 a.m.