Triple
T32068017
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Monsters, Inc. scare floor |
E818935
|
entity |
| Predicate | energyProductionGoal |
P86516
|
FINISHED |
| Object | powering Monstropolis |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: powering Monstropolis | Statement: [Monsters, Inc. scare floor, energyProductionGoal, powering Monstropolis]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: energyProductionGoal Context triple: [Monsters, Inc. scare floor, energyProductionGoal, powering Monstropolis]
-
A.
energyStrategy
chosen
Indicates a relationship where an entity adopts, follows, or is characterized by a particular plan or approach for producing, managing, or using energy.
-
B.
energyGenerationMechanism
Indicates the method or process by which energy is produced or generated by an entity.
-
C.
powerplantOutput
Indicates the amount of energy or power produced by a power plant over a given period or at a specific moment.
-
D.
plannedPowerplant
Indicates that a power plant is intended or scheduled to be built or developed, but is not yet constructed or operational.
-
E.
electricPowerOutput
Indicates the amount of electrical power produced or delivered by an entity.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348fecc088190af1470afe5a969f0 |
completed | April 30, 2026, 12:20 p.m. |
| NER | Named-entity recognition | batch_69f6fb19063c81909466b329655c8583 |
completed | May 3, 2026, 7:36 a.m. |
| PD | Predicate disambiguation | batch_69f6f969b4cc8190afb473a2d8b110bc |
completed | May 3, 2026, 7:29 a.m. |
Created at: May 1, 2026, 12:22 a.m.