Triple

T32059819
Position Surface form Disambiguated ID Type / Status
Subject Maurice Moss E818716 entity
Predicate instanceOf P0 FINISHED
Object IT technician C27959 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: IT technician
Context triple: [Maurice Moss, instanceOf, IT technician]
  • A. technical personnel chosen
    Technical personnel are individuals with specialized knowledge and skills who install, operate, maintain, or support technical systems, equipment, or processes within an organization.
  • B. IT system environment
    An IT system environment is the integrated combination of hardware, software, networks, data, and supporting infrastructure in which information technology solutions are developed, deployed, operated, and maintained.
  • C. computer security specialist
    A computer security specialist is a professional who protects computer systems, networks, and data from unauthorized access, attacks, and vulnerabilities by implementing, monitoring, and improving security measures.
  • D. systems analyst
    A systems analyst is a professional who studies an organization’s existing computer systems and procedures to design and implement more efficient, effective technical and business solutions.
  • E. systems engineer
    A systems engineer designs, integrates, and manages complex systems across their life cycles, ensuring that all components—technical, human, and organizational—work together effectively to meet specified requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348fdacec8190b9f74375ca3b2094 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:21 a.m.