Triple

T32037081
Position Surface form Disambiguated ID Type / Status
Subject Hope Creek Unit 1 E818124 entity
Predicate instanceOf P0 FINISHED
Object nuclear power reactor C2094 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear power reactor
Context triple: [Hope Creek Unit 1, instanceOf, nuclear power reactor]
  • A. nuclear reactor chosen
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • B. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • C. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • D. nuclear reactor technology
    Nuclear reactor technology encompasses the design, operation, and safety systems of devices that control nuclear fission reactions to reliably produce usable energy.
  • E. water-cooled reactor
    A water-cooled reactor is a nuclear reactor that uses water as both a coolant to remove heat from the reactor core and often as a moderator to slow down neutrons, enabling a controlled fission chain reaction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348fbc8148190b3c0f95d4772b153 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:19 a.m.