Triple

T32021888
Position Surface form Disambiguated ID Type / Status
Subject Metro-North standard signage E817714 entity
Predicate instanceOf P0 FINISHED
Object transportation signage standard C13507 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation signage standard
Context triple: [Metro-North standard signage, instanceOf, transportation signage standard]
  • A. transportation standard
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • B. traffic control device
    A traffic control device is any sign, signal, marking, or other installed equipment used to regulate, warn, or guide road users for the safe and efficient movement of traffic.
  • C. roadside marker
    A roadside marker is a fixed object placed along a road to provide drivers with information, guidance, or warnings about location, boundaries, or conditions.
  • D. signage system chosen
    A signage system is an organized set of visual elements and standards used to guide, inform, and direct people within physical or digital environments.
  • E. road designation
    A road designation is a label or code assigned to a roadway (such as a route number, name, or classification) that identifies its function, hierarchy, and navigational role within a transportation network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348fb04e4819081f4eab040ed7959 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:17 a.m.