Triple

T31981374
Position Surface form Disambiguated ID Type / Status
Subject One More Chance E816588 entity
Predicate nextSingleYear P45802 FINISHED
Object 2013 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2013 | Statement: [One More Chance, nextSingleYear, 2013]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: nextSingleYear
Context triple: [One More Chance, nextSingleYear, 2013]
  • A. nextYear
    Indicates that one time point occurs in the calendar year immediately following another time point.
  • B. nextSingleReleaseYear chosen
    Indicates the calendar year in which the entity’s next individual (non-album) release is scheduled or occurred.
  • C. nextEventYear
    Indicates the calendar year in which the subsequent occurrence of a given event takes place.
  • D. nextSingle
    Indicates that one entity is the immediately following single item in a sequence or ordered set relative to another entity.
  • E. nextWorkReleaseYear
    Indicates the year in which the next work in a sequence or series is scheduled to be released.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348f6a3008190bfb59ca695fd68e2 completed April 30, 2026, 12:20 p.m.
NER Named-entity recognition batch_69f6b34d116c81908086e458fe8bf42e completed May 3, 2026, 2:30 a.m.
PD Predicate disambiguation batch_69f6b151ad008190836c1bcdec503ce2 completed May 3, 2026, 2:22 a.m.
Created at: May 1, 2026, 12:11 a.m.