Triple

T31927369
Position Surface form Disambiguated ID Type / Status
Subject studio system E815151 entity
Predicate instanceOf P0 FINISHED
Object film production system C60245 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film production system
Context triple: [studio system, instanceOf, film production system]
  • A. film production technology
    Film production technology encompasses the tools, equipment, and digital systems used to plan, capture, edit, and distribute motion pictures.
  • B. film production program
    A film production program is an organized course of study or training that teaches the creative, technical, and logistical skills needed to develop, shoot, and edit motion picture projects.
  • C. screen production
    Screen production is the process of planning, creating, and assembling visual content for film, television, or digital platforms, encompassing pre-production, filming, and post-production activities.
  • D. film studio
    A film studio is a company or facility that finances, produces, and often distributes motion pictures and related media content.
  • E. film and television production phase
    A film and television production phase is a distinct stage in the creation process—such as development, pre-production, production, post-production, or distribution—during which specific tasks and workflows are carried out to move a project from concept to final release.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348f1df848190851bbfb988da3414 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:04 a.m.