Triple

T31896502
Position Surface form Disambiguated ID Type / Status
Subject Mexico City integrated fare system E814296 entity
Predicate startOfIntegrationProcess P72290 FINISHED
Object late 2010s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: late 2010s | Statement: [Mexico City integrated fare system, startOfIntegrationProcess, late 2010s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: startOfIntegrationProcess
Context triple: [Mexico City integrated fare system, startOfIntegrationProcess, late 2010s]
  • A. integrationProcess
    Indicates the process or workflow through which separate components, systems, or functions are combined and coordinated to operate as a unified whole.
  • B. startTrigger
    Indicates that one event, condition, or action initiates or causes the beginning of another.
  • C. implementationStart chosen
    Indicates the point in time or event at which the implementation of something (such as a plan, system, or project) begins.
  • D. exportStart
    Indicates the point in time or event at which an export process or outbound transfer of goods, data, or resources begins.
  • E. startDuring
    Indicates that one event or interval begins at some point strictly within the duration of another event or interval, but not at its start.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348ef817481908440e2250319bcc8 completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69ff48199b1c8190bb05872f8a4f4673 completed May 9, 2026, 2:43 p.m.
PD Predicate disambiguation batch_69ff4746b1cc8190854f70a124df7d04 completed May 9, 2026, 2:40 p.m.
Created at: April 30, 2026, 11:59 p.m.