Triple
T31884365
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thermal Oxide Reprocessing Plant |
E813967
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | nuclear fuel cycle facility |
C16233
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: nuclear fuel cycle facility Context triple: [Thermal Oxide Reprocessing Plant, instanceOf, nuclear fuel cycle facility]
-
A.
uranium processing facility
A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
-
B.
nuclear power facility
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
-
C.
uranium enrichment facility
A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
-
D.
radioactive waste processing facility
A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
-
E.
nuclear chemical separations facility
chosen
A nuclear chemical separations facility is an industrial installation that processes irradiated nuclear fuel or materials to chemically separate and recover specific radionuclides or elements for reuse, waste management, or further nuclear applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348ed74bc81909846aaa6a3c7318c |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:57 p.m.