Triple
T31819630
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Polish notation |
E812224
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | prefix notation |
C24403
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: prefix notation Context triple: [Polish notation, instanceOf, prefix notation]
-
A.
reverse Polish notation language
A reverse Polish notation language is a programming or expression language where operators follow their operands, enabling unambiguous, stack-based evaluation without the need for parentheses.
-
B.
class prefix
A class prefix is a short, standardized string placed at the beginning of class names to convey their role, category, or namespace within a codebase.
-
C.
hyperoperation notation
Hyperoperation notation is a systematic way of representing an infinite hierarchy of arithmetic operations (such as addition, multiplication, exponentiation, tetration, and beyond) using a unified symbolic scheme.
-
D.
order of precedence
Order of precedence is a conceptual hierarchy that determines the relative importance, priority, or ranking of items, rules, or entities when resolving conflicts or making decisions.
-
E.
notation system
chosen
A notation system is a structured set of symbols and rules used to represent information, concepts, or processes in a concise and standardized way.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348e97fa48190aa06286962af6dee |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:45 p.m.